|
View:
|
Show:
24
48
126
|
|||||
Perth
leonfryman: 2011
in: Digging/Building
239 views | 1 comments
Tumbulgum
none
First berm we built at the bottom of the pines.
Perth
leonfryman: 2011
in: Digging/Building
199 views | 1 faves
Tumbulgum
none
A+B line roadgaps, the C line will be a double roller onto the road then down the landing. The A line gap is 25-30ft.
Perth
leonfryman: 2011
in: Digging/Building
220 views | 1 faves
Tumbulgum
none
Building the A+B roadgap kickers
Perth
leonfryman: 2011
in: Digging/Building
174 views
Tumbulgum
none
High speed berm, above the pines, with views of the city and ocean in the background
|
About Us
ContactsAdvertise
AdvertisingCool Features
Pinkbike DailyRSS
Pinkbike RSS Feed